If your team opens the app every morning to start work, adding a field or a page must not spoil that morning. On Workzed a change goes through four stages, and the last word at each one is yours.
1. Preview: your live app does not change
An approved change is prepared at its own preview address and passes the checks. Meanwhile your staff use the live app as usual. You can open the preview in phone, tablet and computer views and try it; if you have a website, you preview it separately.
2. Release and changes
If you like it, “Go live”. If you want something different, write it in the chat after it is live; only the difference is built. You can also take a released change back from “Recent changes”. A large setup is split into the smallest parts, so you preview and release each part on its own; the next part starts after it.
3. After release: automatic rollback
If the new version does not open properly after release, the previous version comes back by itself and the change's credit is refunded. Nobody has to step in at midnight; the release history says what happened.
4. Changing your mind later: undo and backups
From the release history, “Undo” takes a change back. Only the code goes back, your data is not deleted; the undo also goes through preview and release, and is free.
Your data is backed up every day and kept 7–30 days by plan. “Go back to this backup” puts the data back as it was that day; a backup of the moment is taken first, so this step can be undone too. If you delete a project by mistake, you can take it back from its page within 30 days.
A change that could not finish never touches your live app. Try again, describing it a little differently or in smaller parts.